ATP Flash Training

Guidance on the Non-Infrastructure Work Plan (22-R)

Guidance on the Non-Infrastructure Work Plan (22-R)

Objectives:

  • A review of NI in ATP Cycle 4
  • An overview and demonstration of the Exhibit 22-R Form
  • Tips on how to complete the 22-R

Watch the Flash Training. (14:54 minutes)