ATP Flash Training

Interim ATP Count Methodology Guidance

Objectives:

  • How to develop the ATP user counts for the project evaluation metric
  • How to apply a consistent methodology across all project
  • How to derive Daily Volume data that is
  • How to distill the “Daily Pedestrian Volume” and “Daily Bicycle Volume” from multiple improvement locations

Interim Count Guidance – September 2019

Presentation Slides